Innovate Packaging Technology, Create Satisfaction Value For Customers
Place of Origin: | China |
Brand Name: | West River |
Certification: | ISO, CE |
Model Number: | WJ300 series |
Minimum Order Quantity: | 1 |
---|---|
Price: | 0.01 |
Packaging Details: | 12 containers |
Delivery Time: | 120days |
Payment Terms: | L/C, T/T |
Supply Ability: | 100 sets/per year |
Width: | 1600-2800mm | Speed: | 300m/min |
---|---|---|---|
Type: | 3ply & 5ply | Flutes: | A C B EFflutes |
Change Flutes: | Up To 5 Mins (15/50mins For Option) | Name: | Corrugated Machine |
Raw Material: | Craft Paper Material (for Corrugating) |
2. Max. Speed: 300m/Min
3. Standard: GB
4. Certification: ISO9001, CE
*Siemens profibus control system
*Intelligent tempearture control and steam saving system
*Automatic tension and balance tension control
*International advanced intelligent pressure loading system, vector pressure loading control
*High speed and low noise control
*Provide free customized whole carton plant design, auto logistics design, equipment placement and installation, ERP system connection, local employee training
*Modular design, easy for upgrate and Maintenance
TECHNIQUE DATE:
Model
|
WJ300 Series
|
Design Speed
|
300m/min
|
Width
|
1600-2800mm (option)
|
Production Volume
|
~520,000 - 910,000 sq.m/day
|
Flute type
|
A, B, C, E, F, G flutes (height customized)
|
Size(L*W*H)
|
85m*9m*5.4m
|
Steam consumption
|
4000kg/h(1.1-1.2Mpa)
|
Power supply
|
~400KW ,~380Vac, 50HZ, 3 phases 4 wires
|
Pre-heater
|
Arc plate(new) or Cylinder Block(temperature sensor)
|
Correction device
|
Auto tension control device
|
Double Facer
|
Air bag, Auto steam system
|
Steam system
|
With
|
Air Compressor
|
With
|
Display Board
|
With
|
Auto-centralized
|
With
|
Auto-Splicer
|
With
|
PMS SYSTEM
|
With
|
Intelligent temperature system
|
With
|
Surface Color
|
Option
|
ERP System
|
Option
|
Roll Paper and Cardboard logistic system
|
Option
|
Changing Orders without stop
|
With
|
Deliver day
|
120 days
|
Installation
|
By supplier
|
Warranty
|
1 year
|
West River brings different technologies for customers options, according to different customer's situation, we provide customized deisgn solution for highly automatic and intelligent products. Our high speed inner vacuum single facer has been proved around the world customer for different solutions and situation. The high strength cardboard and stable performace, good service win our good reputation around our customers.
Product Show
West River Provides Best Quality Equipment
Layout Design
Our profession engineers are able to design the complete factory layout according to your requirements.
Finish products
Our equipment help you to produce high-quality cardboard and carton.
Guangdong Zhaoqing WEST RIVER Packaging Machinery Co., Ltd.
In the past couple of decades we have always insisted on high quality, our products are exported to more than 90 countries.
WestRiver Packaging Machinery was founded in 1954. The first semi-automatic single facer of China was born at our factory in 1978. It was the prelude of corrugated packaging industry.
Our engineers are available to service overseas
We attend to the trade fairs all over the world
You are always welcome to visit our factory
We adhere to the "quality first, reputation first" business purposes, and continuously forgeahead.
FAQs
1Q: Are you the manufacturer?
A: Yes, we are the professional manufacturer.
2Q: Where are your factory located in ?
A: Our factory located in Zhaoqing city, Guangdong, China
3Q: Where is the nearest airport of factory ?
A: The nearest airport is Guangzhou Baiyun International airport. It take 1.5 hours from Guangzhou to Zhaoqing factory by car. We are glad to pick you up at the airport.
4Q: What is your business process?
A: Talk about requirements, confirm details, sign a sales contract, pay for deposit, arrange production, test machines, buyer pay for the balance payment, arrange shipment.
5Q: How to control machine quality ?
A: All material are environmental protection,non-pollution
We have professional technicists to supervising to production
Our professional department to examine about every production process
6Q:What can you do if the machine broken?
A: The warranty period is 1 year. If the broken parts can't repair, we can send the new parts to replace the broken parts for free, but you need to pay the freight. After warranty period, we can negotiate to the problems, and we supply the technical support for the whole life of the equipment.
Contact Person: Mr. David
Tel: +86 138 2464 8608
Fax: 86-758-2716682