Innovate Packaging Technology, Create Satisfaction Value For Customers
Place of Origin: | Guangdong |
Brand Name: | West River |
Certification: | SGS CE Verification ISO |
Model Number: | P |
Minimum Order Quantity: | 1 |
---|---|
Price: | 30,000 |
Packaging Details: | Container |
Delivery Time: | 120 days |
Payment Terms: | TT, L/C |
Supply Ability: | 25 sets |
Minimum Order Quantity: | 1 set |
Name: | NC Thin Blade Double Station Slitter Scorer | Slitter: | Up To 9 |
---|---|---|---|
Scorer: | Up To 16 | Control System: | Siemens |
Change Time: | 1 Seconds | Scoring Distance: | 120 Or 0mm |
Name: | Corrugated Machine | Raw Material: | Craft Paper Material (for Corrugating) |
DOUBLE STATION QUICK SLITTER SCORER
For High Speed 250-400m/min Corrugated Cardboard Production Line
Non Stop Production
· Unique design with fastest Robotic arm setup time 3-10 seconds for Quick machine.
· Instant machine with individual motors for each head for 1 second setup time.
· Max Speed: 350mpm, Non Stop Order Change Speed: 260 mpm
· Variety of scoring profile. Standard machine comprises of point to point, male to female, offset scoring and point to flat.
· Min score: 0mm
· Min slit width: 135mm
· Min trim: ≤ 5mm
· Accuracy: ±0.5 –1mm
· Standard top slits 4 outs for 1800mm width, 6 outs for 2500mm width and 7 outs for 2800mm width machine
· Tungsten carbide thin slit blades for clean cut of boards
· Individual grinder and wick lubricator for each slit head
· Optional for trim saver alignment
Product Show
With Die Cutting Rotary Shearer for non Stop Design
Guangdong Zhaoqing WEST RIVER Packaging Machinery Co., Ltd.
FAQs
1Q: Are you the manufacturer?
A: Yes, we are the professional manufacturer.
2Q: Where are your factory located in ?
A: Our factory located in Zhaoqing city, Guangdong, China
3Q: Where is the nearest airport of factory ?
A: The nearest airport is Guangzhou Baiyun International airport. It take 1.5 hours from Guangzhou to Zhaoqing factory by car. We are glad to pick you up at the airport.
4Q: What is your business process?
A: Talk about requirements, confirm details, sign a sales contract, pay for deposit, arrange production, test machines, buyer pay for the balance payment, arrange shipment.
5Q: How to control machine quality ?
A: All material are environmental protection,non-pollution
We have professional technicists to supervising to production
Our professional department to examine about every production process
6Q:What can you do if the machine broken?
A: The warranty period is 1 year. If the broken parts can't repair, we can send the new parts to replace the broken parts for free, but you need to pay the freight. After warranty period, we can negotiate to the problems, and we supply the technical support for the whole life of the equipment.
Contact Person: Mr. Pham
Tel: +86 138 2752 0435
Fax: 86-758-2716682